All projects

LLC «EK Chemical»

Druzhny village, Russia

2019-2022

  • Project and delivery of equipment for perlite swelling section
  • Development of project documentation for dry building mixtures, primer and impregnating compositions production plant with a capacity of 25 tons/hour

JSC «Borsky Stekolniy Zavod»

Bor, Russia

2002-2022

  • Dosing complexes
  • Design and production of new upgraded batch feeders in glass furnace
  • Reconstruction of return cullet transport lines
  • Portable installation of sheet glass waste beating and canning in soft containers of single use
  • Cover for railway carriages for sheet glass transportation
  • Automatic control system
  • Equipment installation
  • Project of reconstruction of batch feed lines to glass melting furnaces

JSC «Krasnoe Eho»

Krasnoe Eho, Russia

1994-2022

  • Project of dosing-mixing lines reconstruction 
  • Project of silicate lamp acceptance, processing and dosing section
  • Dosing-mixing lines
  • Process equipment of batch plant
  • Controlling system of batch plant equipment
  • Process equipment for the return cullet collection lines
  • Dosing-mixing complex for small additives
  • Glass cullet feed line equipment 
  • vibrating piped granulators

JSC «Zavod Kovrovsky dolomite molotiy»

The Vladimir region, Russia

2010-2022

  • Project of additional dedusting section for ground limestone preparation line 
  • Project of dolomite processing for glass industry
  • Project of the second stage for production of ground dolomite
  • Project of fine grind dolomite production line by aeroclassification of mineral powder
  • Process equipment 
  • Automatic control system